May 31, 2019
by CRI Admin
For the remodel of Elysian Brewing’s Capitol Hill location in Seattle, WA we partnered with Mallet Construction to create flooring solutions suitable for their different areas and needs. In the brewing and kitchen areas we installed over 3,000 sf of Poly-Crete MDB with a Poly-Crete TF topcoat, and in the upper and lower dining areas we installed aesthetically pleasing, polished concrete floors.
Read More›